Rishikesh–Karnprayag New BG Rail Line
126 km · Uttarakhand · Railway corridor assignment.
From railway corridors and highway engineering to geospatial intelligence, water resources and environmental studies, IREC supports technically demanding infrastructure assignments through multidisciplinary expertise.
RAIL CORRIDORS 01
STRUCTURES 02
GIS & WATER 03
TUNNELS 04
Assignments are grouped by the work delivered, not only by the client or parent project. A client may therefore appear in more than one sector.
126 km · Uttarakhand · Railway corridor assignment.
147 km EIA assignment and GIS/alignment-related work · Assam.
Alignment study, DPR and EIA · Punjab and Himachal Pradesh.
180 km · Arunachal Pradesh.
72 km · Arunachal Pradesh · DPR and EIA study.
70 km · Karnataka.
Odisha · NX-size core drilling for FLS is listed in the company profile.
Baramulla–Uri, Sopore–Kupwara, Anantnag–Pahalgam and Avantipore–Shopian; FLS study for a 189 km rail line is also referenced.
Approach-road assignment associated with the railway project.
192 km · Widening from four lanes to six lanes between Varanasi and Aurangabad, Uttar Pradesh.
Two-lane road projects totalling approximately 300 km; ADB-funded programme.
Ramtek–Gondia, Bhivapur–Bhandara and Daulatabad–Yeola · EIA, EMP, SIA, R&R and forest proposals.
6 km bridge over the Ganga · Tender document preparation for a PPP project.
1.2 km · Connecting Dharanaula Road and Lower Mall Road, Almora, Uttarakhand.
Design of T7–T8 and T11–T14 tunnel projects · West Bengal and Sikkim.
Structural proof checking for a World Bank-funded railway project.
Drone-based survey assignment associated with railway infrastructure; classified here by the geospatial survey scope.
Canal network and drainage database for the Ganga Basin system.
Geoportal for canal asset management, monitoring and information access.
Detailed map of the Upper Ganga Canal.
Hydrological project work in Uttarakhand and Uttar Pradesh; individual assignment scopes vary.
Surveys and discharge measurement across canal systems in the Ganga Basin.
Analysis covering Haridwar to Allahabad.
Analysis for five hydropower projects on the Bhagirathi River, Uttarakhand.
Hydrological studies.
Traffic, EIA and coral studies; DPR-related work · Lakshadweep.
Feasibility study · Zimbabwe.
8.2 km, 33 kV transmission line from Gullar to Shivpuri.
Forest-clearance support for development of an International Convention Centre and Wellness City.
Consultancy services under UDRP Additional Financing in Uttarakhand.
Study and report preparation for 125 pulp and paper industries in western Uttar Pradesh.
Forest and wildlife consultancy and clearance-related assessment associated with the 126 km railway project in Uttarakhand.
Pond rejuvenation assignment.
Talk to IREC about your project requirements, technical challenges and delivery objectives.